Designer Closets & Cabinets logo
Designer Closets& Cabinets
Back to Blog
Kitchen CabinetsBuying Guide

What a Kitchen Remodel Costs in Central Florida

August 13, 20268 min read
Gray raised panel kitchen with a large island and sink, full room view

The honest answer to "what does a kitchen cost" is that it depends on about nine things, and anyone who gives you a number before asking about them is guessing.

What is more useful — and what this article is actually about — is understanding where the money goes and which decisions move it. Get those right and you can steer a budget rather than react to it.

Where the Money Goes

Typical share of a kitchen remodel budget38%16%15%13%8%Cabinets38%Countertops16%Labor & install15%Appliances13%Plumbing / electrical8%Flooring & tile6%Permits & extras4%Proportions of a mid-range Central Florida kitchen. Cabinets are always the largest single line.
Where a mid-range kitchen budget goes. The proportions hold up far better than the totals do.

These proportions are remarkably stable across projects. Cabinets are always the largest single line, typically somewhere around a third to two-fifths of the total. Countertops and installation labor follow. Appliances vary the most, because that is the line where personal priorities show up hardest.

The practical implication: a decision that changes the cabinet line changes the whole project meaningfully. A decision that changes the tile line barely registers. People frequently agonise over backsplash tile and rush the cabinet decision, which is exactly backwards.

The Three Kinds of Kitchen Project

1. Cabinet refresh. Refacing or repainting the existing boxes, with new doors, drawer fronts, and hardware. Layout stays exactly as it is. The least expensive route by a wide margin, and genuinely the right answer when the existing boxes are sound and the layout works.

2. Cabinet replacement, same layout. New cabinets, new countertops, appliances stay where they are. Plumbing and electrical do not move, which removes both the cost and the permit complexity. This is the most common project we do and usually the best value.

3. Full remodel with a layout change. Walls, plumbing, electrical, and often structure. This is where the price stops being predictable, because it is where the surprises live.

The step from (2) to (3) is the single biggest jump in a kitchen budget. Moving a sink ten feet is not a plumbing task, it is a plumbing task plus a permit plus a slab consideration plus a floor repair.

The Decisions That Actually Move the Number

In rough order of impact:

  1. 1Whether the layout changes. Moving plumbing and gas is the most expensive category of work per hour of visible result.
  2. 2Cabinet construction and finish. Box material, drawer boxes, slides, and painted versus stained versus thermofoil.
  3. 3Countertop material. The gap between a builder-grade granite and a premium quartz or natural stone slab is large, and it is per square foot, so a big island multiplies it.
  4. 4Appliances. The widest possible range. A package can be a modest line item or the largest one in the project.
  5. 5Whether you need permits and trades. Electrical upgrades for induction, new circuits, venting a hood externally.
  6. 6Cabinet interiors. Rollouts, drawer banks, lifts, and organizers add up. They are also, per dollar, the things you notice every single day.

Bands We Typically See in Central Florida

Treat these as orientation rather than quotation — every one of them moves with kitchen size, material choice, and what is behind the walls.

  • Refacing or refinishing existing cabinets: the entry point, often a third or less of what replacement costs.
  • Replacement cabinets, same layout, mid-range materials: the middle of the market, and where most of our kitchen work sits.
  • Full remodel with layout changes and premium materials: open-ended at the top, driven mostly by appliances and stone.

The most useful thing you can do early is get one real quote against a real measurement. A number derived from your actual room is worth more than any average.

The Line Items That Surprise People

These are the ones that turn up after the contract, and every one of them is avoidable with an upfront conversation:

  • Flooring under the old cabinets. If the existing floor stops at the cabinet line — and it usually does — removing cabinets exposes bare slab. Either the new cabinets sit on new flooring, or the gap has to be patched.
  • Drywall and wall repair behind the old backsplash and cabinets. Almost always needed, rarely quoted upfront.
  • Electrical code updates. Once the kitchen is open, current code applies: GFCI protection, dedicated circuits, and outlet spacing that older Osceola County homes do not have.
  • Range hood venting. If the existing hood recirculates and you want it vented outside, that is a roof or wall penetration.
  • Soffit removal. Popular, and frequently more involved than expected, because soffits often contain ductwork, wiring, or plumbing.
  • Countertop template lead time. Stone cannot be templated until the cabinets are installed, which builds a two-to-three-week gap into every project. It is not a cost, but it is a cost of living without a kitchen.
  • Appliance panel readiness. Panel-ready appliances need panels built to their spec, and those specs vary by manufacturer.
Cream base cabinets and dishwasher installed over new plank flooring mid-remodel
Mid-install. By this point every decision that affects the price has already been made.

Where to Spend and Where to Save

Worth spending on:

  • Cabinet boxes and drawer hardware. These are what fail, and they are the parts you cannot upgrade later without starting over.
  • Rollouts and drawer banks. The single highest satisfaction-per-dollar item in any kitchen we build.
  • Lighting. Under-cabinet LED is inexpensive during a build and transforms how the room feels.

Reasonable to save on:

  • Backsplash tile. A modest tile installed well looks better than an expensive tile installed badly, and it is the easiest thing to change later.
  • Hardware. It is genuinely swappable in an afternoon. Buy what you like now and change your mind in five years.
  • Appliances beyond your actual cooking. A commercial-grade range in a household that reheats is a large sum spent on a feeling.

Two Things That Reduce Cost Without Reducing Quality

  • Keep the plumbing where it is. If the layout works, leaving the sink and gas lines alone removes trades, permits, and risk in one decision.
  • Buy factory-direct. A large part of a typical cabinet price is the chain between the shop and your house. Everything we sell is built in our own St. Cloud facility and installed by our own crew, with no dealer margin and no subcontractor markup in between.

Getting a Real Number

A quote worth having comes from a real measurement of your room, a specific cabinet specification, and a written scope of what is and is not included. Anything else is an estimate of an average kitchen, and yours is not one.

Our in-home consultations are free, they include the full field measure, and you leave with a design and a written price rather than a range.

Frequently Asked Questions

What is the biggest cost in a kitchen remodel?

Cabinets, almost always — typically somewhere between a third and two-fifths of the total budget. Countertops and installation labor come next, with appliances varying the most from project to project.

How much does it cost to move a kitchen sink?

It varies enormously depending on what is under the slab and how far it moves, but it is the single most consequential change you can make to a budget. If the existing layout works, leaving the plumbing in place removes cost, permits, and risk all at once.

Is refacing cabinets cheaper than replacing them?

Substantially — often a third or less of the cost of replacement. It is genuinely the right choice when the existing boxes are structurally sound and the layout already works for you.

What unexpected costs come up in a kitchen remodel?

The most common are flooring gaps where the old cabinets sat, drywall repair behind the old backsplash, electrical updates required by current code once the walls are open, and venting a range hood that previously only recirculated.

Where is the best place to save money in a kitchen?

Backsplash tile, hardware, and appliances beyond what you actually cook with. Save on things that are easy to change later; spend on cabinet boxes, drawer hardware, and interior storage, which you cannot upgrade without starting over.

How do I get an accurate quote?

From a real measurement of your room and a specific written cabinet specification. Our in-home consultation is free, includes the full field measure, and produces a design and a written price rather than a range.

Ready to Get Started?

Book a free in-home consultation and let our designers create a custom system built specifically for your space.

Get Started Today

Ready to Get Started?

Our experienced designers will visit your home, measure every space, and present a full 3D design — all for free. We even offer 0% financing.